Home

About

Board of Trustees

Staff

In the News

Site Location Info

Calendar/Agendas/Minutes

Redevelopment Info

Studies Reports Documents

Reuse Plans/Guidelines

Brunswick Reuse Plan

BNAS Reuse Plan Map

Topsham Annex Plan

TA Reuse Map and Legend

Design Guidelines

Environmental Conditions

Related Links

RFPs/Jobs

Contact Us

BXM AIRPORT

Topsham Annex Reuse Master Plan
BNAS Topsham Annex
BNAS Topsham Annex
The Topsham Annex Reuse Plan is the result of over a year of public engagement and disucssion on how the Topsham Annex should be redeveloped following the closure of BNAS - Topsham Annex. All documents relating to the Final Reuse Plan can be fiewed by clicking on the links below. Please contact us if you are interested in reviewing the appendices.
Table of Contents and Section 1: Executive Summary (316 kb)
Section 2: Background and Overview (744 kb)
Section 3: Public Engagement (1.68 mb)
Section 4: Existing Conditions - Part 1 (3.27 mb)
Section 4: Existing Conditions - Part 2 (2.5 mb)
Section 4: Existing Conditions - Part 3 (1.33 mb)
Section 5: Reuse Alternatives and Plan Selection (941 kb)
Section 6: Topsham Annex Reuse Master Plan (967 kb)
Report Supplement - January 2008  (206 kb)
Executive Summary 11X17 Newspaper Insert
(2.6 mb)
Homeless Assistance Submission Package (1.3 mb)


The redevelopment of Brunswick Landing and Topsham Commerce Park is managed by the
Midcoast Regional Redevelopment Authority (MRRA)

2 Pegasus St., Suite 1, Unit 200 ♦ Brunswick, ME 04011 ♦ Tel: 207-798-6512 Fax: 207-798-6510 ♦ Email:
info@mrra.us